SHERWOOD, ABINGDON OX14 3NL

Purchase Price

£290,000

Stamp Duty & Legal Fees

£19,000

Date of Purchase

December 2021

Project & Build Investment:

Turn-Key Service Fees

£18,000

Consultant & Compliance Fees

£9,000

Refurbishment & Build Costs

£106,000

2nd fix & Furnishings

£20,000

Total Start-Up Cost

£153,000

Key Metrics

Estimated Value

£450,000

Estimated Gross Yield

8.66%

Estimated Cash-on-cash Return

8.38% per annum

Gross Monthly Rental

approx. £3,400

Monthly Profit

approx. £1,100

Before

3 Beds | 1 Bath

A practical three-bedroom mid-terrace with well-proportioned spaces and strong potential for HMO conversion and modern shared living.

After

4 Beds | 3 Ensuites | HMO

The property now presents as a contemporary four-bedroom HMO, with a redesigned layout, modern specification and upgraded building systems.

Renovations Made

RPG took the property back to brick, reworking the internal layout and upgrading the building to create a 4-bed, 3-ensuite HMO configuration.

The focus was on making better use of the existing footprint while improving the property’s specification, efficiency and day-to-day functionality.

Space reconfiguration

Internal layout redesigned to create four bedrooms with private en-suites.

Building services

Complete re-plumbing, electrical rewire and installation of a new heating system.

Energy upgrades

Solar PV and battery storage introduced to support improved energy efficiency.

Fire & safety

Interlinked fire alarm system, FD30 fire doors and associated compliance works.

Interior transformation

New partitions, plastering, decoration, joinery and contemporary finishes throughout.

External works

Improvements to the rear garden and overall external presentation.

From Potential to a Beautifully Finished HMO

Historical figures from a specific project and period. Results are not representative of all projects and are not indicative of future performance. Figures may depend on assumptions, financing arrangements, operating costs, occupancy, market conditions and other project-specific factors.